Process 1 : Put Into The Mixer Machine To Mixture The Material.
过程1:放入混合机中混合物料。
Process 2: Mixture Is Than Lowered Into Trolley Container,formulation Mortar Flowed To Container Trolley, And Container Trolley Pushed To Moulding Area, Fomulation Mortar Is Poured Into Muld And Levelled And Left To Dry.
过程2:将混合物放入台车集装箱中,配制砂浆流入集装箱台车,并将集装箱台车推到成型区域,将配制砂浆倒入多层并平整并放置干燥。
Process 3 : Is Measure At Random Packing And Storage Mode.
过程3:在随机包装和存储模式下进行测量